Secant drilled shaft wall with estimated cost of over $15 million was replaced by innovative driven pile solution costing only $2 million. |
|
|
|
|
Drilled shaft work proposal requiring 60 nights of constant noise was replaced by only 9 days of driven piles during normal working hours. |
|
|
|
|
Large bridge designed for drilled shafts is switched to driven piles; testing advantage of driven. |
|
|
|
|
A review of the quality that goes into all types of driven piles: timber concrete and steel sections. |
|
|
|
|
Driven piles are the foundation of choice over drilled shafts for wind farm turbine installations in Europe. |
|
|
|
|
Driven pile noise and vibration issues are overcome by test program and working closely with the engineer; installation completed in 3 days rather than the planned 10 days. |
|
|
|
|
General overview of oldest, yet still viable, driven pile type. |
|
|
|
|
Another driven pile advantage for lateral loads and how to make a proper design even in seismic conditions. |
|
|
|
|
When properly designed, concrete piles can be used for seismic applications. |
|
|
|
|
Overall descriptions of prestressed concrete piles with benefits are presented. |
|
|
|
|
Driven piles were used in an historic district near a hospital and overcame all vibration and noise issues. |
|
|
|
|
Driven piles chosen over augercast and drilled shafts because of the economy and reliability of driven piles. |
|
|
|
|
Describes the process and differences among various available pipe pile options. |
|
|
|
|
Explains the need and proper use of cushions to protect concrete piles during driving. |
|
|
|
|
Augercast piles successfully replaced by driven piles; noise and vibration issues in old historic district easily solved. |
|
|
|
|
Author’s research clearly shows superiority of driven piles in brownfield sites. |
|
|
|
|
What are they and what they do. |
|
|
|
|
Innovative test program saved time and money. |
|
|
|
|
Take advantage of the testing commonly performed on driven piles; save money and reduce risk. |
|
|